Everything about The Manchester Ship Canal totally explained
The
Manchester Ship Canal is a wide, long, river navigation in
North West England, opened on
21 May 1894. At the time of its completion, it was the largest navigation canal in the world.
The "Big Ditch", as it's sometimes known, consists of the rivers
Irwell and
Mersey made navigable for seagoing ships from the
Mersey Estuary to
Salford Docks in
Greater Manchester. It transformed
Manchester from a landlocked city into a major sea port.
Early history
The idea that the Rivers Mersey and Irwell should be made navigable from the Mersey Estuary in the west to Manchester in the east was first proposed in 1660, but it wasn't until 1720 that the necessary
parliamentary bills were tabled. Work began in 1724, and by 1734 boats could make the journey from quays in Water Street, Manchester, to the sea. The Mersey and Irwell was only navigable by small ships however, and during periods of drought, or when strong easterly winds held back the tide in the estuary, there wasn't always a sufficient depth of water for a fully laden boat. The completion of the
Bridgewater Canal in 1776, and the opening of the
Liverpool & Manchester Railway in 1830, meant increasing competition for the carriage of goods, and in 1844 ownership of the Mersey & Irwell Navigation was transferred to the Bridgewater Trustees. In 1872, it was sold to The Bridgewater Navigation Company for
£1,112,000, and was open to 50-
ton (51
t) boats for only 47 out of 311 working days. The dues charged by the
Port of Liverpool, and the railway charges from there to Manchester, were also perceived to be excessive; it was often cheaper to import goods from
Hull, on the other side of England, than it was to use Liverpool, about away. A
ship canal was proposed as a way to reverse Manchester's economic decline by giving the city direct access to the sea for its imports and its exports of manufactured goods.
The canal was championed by Manchester manufacturer
Daniel Adamson, who arranged a meeting at his home (The Towers, in
Didsbury) on
27 June 1882. He invited representatives of several
Lancashire towns, local businessmen and politicians, and two civil engineers,
Hamilton Fulton and
Edward Leader Williams. Fulton proposed a tidal canal, with no
locks and a deepened channel into Manchester; Williams was in favour of a series of locks. Both engineers were invited to submit proposals, and Williams' plans were selected to form the basis of a bill submitted to parliament in November 1882. However, due to intense opposition by Liverpool and the railway companies, the necessary enabling
Act of Parliament wasn't passed until
6 August 1885. Certain conditions were attached however; £5 million had to be raised, and the ship canal company had to buy both the Bridgewater Canal and the Mersey & Irwell Navigation within two years. The estimated cost of construction was £5,160,000, and the work was expected to take four years to complete.]]
The enabling act of parliament stipulated that the ship canal company's entire share capital of £8 million had to be issued within two years, otherwise the act would lapse. Adamson wanted to encourage the widest possible share ownership, and he believed that the funds should be raised largely from the working population.
Richard Peacock, the vice-chairman of the Provisional Manchester Ship Canal Committee, had said in 1882:
The enabling act though, didn't allow the company to issue shares of less value than £10. To make them easier for ordinary people to buy, shilling coupons were issued in books of ten, so that shares could be paid for in instalments. However, by May 1887 only £3M had been raised. The contractor chosen to construct the canal, Thomas Walker, agreed to accept £½M of the contract price in shares, but raising the remainder required another act of parliament to allow the company's share capital to be restructured as £3M of
ordinary shares and £4M of
preference shares. Construction of the canal began on
11 November 1887, when
Lord Egerton of Tatton, who had taken over the chairmanship of the Manchester Ship Canal Company from Adamson, cut the first sod.
Large portions of the eventual cost of construction were borne by Manchester rate-payers, via
Manchester Corporation. Loans were arranged during the early 1890s on condition that the Corporation held 11 of the 21 seats on the Canal Company's board of directors led by
John Aird, an engineering contractor and
MP.
Construction
Construction of the canal was overseen by the chief engineer and designer Edward Leader Williams. Its length was divided into eight sections, with an engineer responsible for each. The first section was from
Eastham to
Ellesmere Port, northwest of which, on a narrow stretch of land between the canal and the Mersey is now Mount Manisty, a huge mound of earth created from the extracted soil. Its name – and that of the adjacent Manisty Cutting – derives from the engineer in charge of that section. The last section to be built was from Weston Point through the
Runcorn gap to
Norton, as the existing docks at Runcorn and
Weston had to be kept operational until they could be connected to the completed western sections of the ship canal.
For the first two years, construction went according to plan, but on
25 November 1889 Walker, the chief contractor, died. Initially the work was continued by his executors, but the project began to suffer a number of setbacks, not helped by severe weather and several serious floods. In January 1891, when the work ought to have been completed, a severe winter added to the difficulties when the Bridgewater Canal, the canal company's only source of income, closed because of ice. The company decided to take over the contracting work itself, and purchased all of the equipment on site for £400,000.
The canal was finally completely filled with water in November 1893, and opened to its first traffic on
1 January 1894. Edward Leader Williams, was knighted by
Queen Victoria at the official opening on
21 May 1894.
The project took six years to complete, at a cost of just over £15M. More than 54 million cubic yards (41,000,000 m³) of material were excavated, about half as much as was removed in the building of the
Suez Canal. An average of 12,000 workers were employed during construction, peaking at 17,000. In terms of machinery, the scheme called upon 228 miles (367 km) of temporary rail track, 173 locomotives, 6,300 trucks and wagons, 124 steam-powered cranes and 192 other steam engines (mainly used for pumping purposes).
Major engineering landmarks of the scheme included the
Barton Swing Aqueduct (carrying the Bridgewater Canal over the Ship Canal) and a neighbouring
swing bridge for road traffic at
Barton.
Route
From
Eastham, the canal runs parallel to, and along the south side of, the River Mersey, past
Ellesmere Port and, having intercepted flows from the
River Weaver, through the Runcorn Gap between
Runcorn and
Widnes and to the south of
Warrington. Between
Rixton, east of the
M6 motorway's
Thelwall Viaduct and
Irlam the canal follows the route of the Mersey – with some old meanders now isolated from the canal – and between Irlam and
Salford it follows the course of the
River Irwell.
Pomona Docks have been filled in and built over. The western four docks have been converted into the
Salford Quays development and can no longer be used as shipping docks. Ships using the Manchester Ship Canal now dock at various places along the canal side, for example at
Mode Wheel.
Most vessels have to terminate at Salford Quays, though smaller vessels can continue up the River Irwell to either join the
Bridgewater Canal via Pomona Lock or, carry on to just short of
Manchester Cathedral.
The Manchester Ship Canal is the eighth-longest ship canal in the world, only slightly shorter than the
Panama Canal in
Central America.
Upon completion, the Manchester Ship Canal ensured that Manchester became Britain's third busiest port, despite being 40 miles (60 km) inland.
By the 1970s, the water in the Manchester Ship Canal and Salford Docks was grossly polluted and underwater visibility for maintenance divers was zero.
Features
| Features and coordinates |
| Location |
Distance from Eastham Locks |
Coordinates (links to map & photo sources) |
| miles |
km |
| Eastham Locks |
0 |
0 |
|
| Runcorn Railway Bridge |
12.5 |
20.1 |
|
| Silver Jubilee Bridge |
12.6 |
20.3 |
|
| Old Quay Lock (closed) |
13.0 |
20.9 |
|
| Old Quay Swing Bridge |
13.3 |
21.4 |
|
| Moore Lane Swing Bridge |
17.1 |
27.5 |
|
| Acton Grange Railway Viaduct |
17.9 |
28.8 |
|
| Chester Road Swing Bridge |
18.7 |
30.1 |
|
| London Road (A49) Swing Bridge |
19.4 |
31.2 |
|
| Cantilever High Level Bridge |
20.1 |
32.3 |
|
| Knutsford Road Swing Bridge |
20.4 |
32.8 |
|
| Thelwall Viaduct (M6) |
22.8 |
36.7 |
|
| Warburton Bridge (Toll) |
28.1 |
45.2 |
|
| Irlam Railway Viaduct |
28.1 |
45.2 |
|
| Barton High Level Bridge (M60) |
30.9 |
49.7 |
|
| Barton Road Swing Bridge |
31.7 |
51.0 |
|
| Barton Swing Aqueduct |
31.7 |
51.0 |
|
| Salford Quays |
34.6 |
55.7 |
|
| Trafford Road Swing Bridge |
35.0 |
56.3 |
|
| Pomona Docks |
35.5 |
57.1 |
| Woden Street Bridge |
36.0 |
57.9 |
|
MSC Railway
To service the large amount of freight being landed at the canal's docks the MSC Railway was created to carry goods from nearby industrial estates, including
Trafford Park, and connect to the various railway companies near the canal. The MSC Railway, unlike most other railway companies in the UK, wasn't nationalised in 1948 and became the largest private railway in the UK during the British Railways era. The MSC Railway operated a large fleet of steam locomotives, many being 0-6-0 tank engines, several of which have been preserved.Such as:
- Hudswell Clarke 0-6-0 No. 4002
- Hudswell Clarke 0-6-0T no. 32 "Gothenburg"
Both of which are at the East Lancashire Railway
Today
Unlike most other British canals, the Manchester Ship Canal was never
nationalised. In 1991 the Ship Canal Company became a part of
Peel Holdings, and as at 2008, the canal is owned and operated by Peel Ports, who also own the
Port of Liverpool.
Today, largely because of the decline of UK-based manufacturing industry and also because many ocean-going ships are too large to fit in the canal, the amount of freight it carries has dropped to over six million tonnes each year.
Salford Docks are no longer used as ship docks, and ships using the Manchester Ship Canal dock at various places along the canal side, for example at
Mode Wheel.
On
18 October 2007, Tesco announced that it had begun using the canal for transporting New World wine between Liverpool and the
Irlam Container Terminal, from where the cargo is offloaded and transported to a nearby bottling plant. Tesco has said that this will save of road haulage per year.
It is possible to join the Manchester Ship Canal from the
Shropshire Union Canal at
Ellesmere Port, from the
Weaver Navigation at Weston near
Runcorn, and from the
Bridgewater Canal at
Pomona Lock in
Salford. However, the safety rules necessary on a major commercial waterway are too onerous for most leisure traffic, so only the most intrepid narrowboaters use the canal to complete a "Shroppie/Trent and Mersey/ Weaver" ring route. A few canal boats take advantage of the less severe restrictions "upstream" of Pomona Lock, to explore the final section of the canal and a short length of the River Irwell.
Maximum size
While the canal was built for ocean-going ships, ship sizes have long outgrown the canal.
In 2005 the maximum length of ship accepted into the canal was 170.68 m with a beam of 21.94 m. However, beams of around 23 m are acceptable with a smaller length. Maximum
draught is 8.78 m.
The maximum size of a ship going to the end of the canal in Salford is length 161.54m, beam 19.35m, and draught 7.31m. This is due to the sizes of the largest locks that can be used, 182.88m x 19.81m. Ships passing the Runcorn bridge also have a height restriction of 24.25 m above normal water levels.
The
Queen Elizabeth II Dock at the entrance to the canal can accept vessels up to 208.79 m long with a 28 m beam, maximum draught 10 m.
While many ships are designed specifically to fit the
Suez and
Panama canals (
Suezmax,
Panamax), the narrower Manchester Ship Canal is no longer of major importance for shipping.
Further Information
Get more info on 'Manchester Ship Canal'.
|
External Link Exchanges
Do you know how hard it is to get a link from a large encyclopaedia? Well we're different and will prove it. To get a link from us just add the following HTML to your site on a relevant page:
<a href="http://manchester_ship_canal.totallyexplained.com">Manchester Ship Canal Totally Explained</a>
Then simply click through this link from your web page. Our crawlers will verify your link, extract the title of your web page and instantly add a link back to it. If you like you can remove the words Totally Explained and embed the link in article text.
As long as your link remains in place, we'll keep our link to you right here. Please play fair - our crawlers are watching. Your site must be closely related to this one's topic. Any kind of spamming, dubious practises or removing the link will result in your link from us being dropped and, potentially, your whole site being banned. |